Difference between the setting time and hardenin time of
concrete
Answer Posted / guest
IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
brickwork labour rate per cum ?
how to caluclate sienerge qty in construction in ap
at which depth the construction of tunnel is economical from cost and engineering aspect.
Describe the advantages and disadvantages of using plastic and timber fenders?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
silt%= silt volume/ silt+sand volume is this right?
what is the minimum compressive strength of clay brick
What is the withdrawal force of steel nails?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
Howmuch bend to be provide for 200/600 BEEM
natucher of concrete &type of concrete?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What are new methods /technologies of pothole patching?
What is the difference between Grade I, II and III of GSB?