Difference between the setting time and hardenin time of
concrete
Answer Posted / guest
IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
I have an span length 16 ft c/c
What is Curtailing of R/F
any book or article on pumped concrete.
All aptitude question of Bechtel
Give me an example of a time when something you tried to accomplish and failed.
What is the zero value in quantity surveying
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
what are the Task work of different labour.?
How to take labor charges for construction of 1cum of concrete?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
How to calculate plastering for elevated water storage tank
In cement making,what is meaning of blend,fineness,density.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
explain what do you mean by the property development.