Difference between the setting time and hardenin time of
concrete

Answer Posted / guest

IST is the time after which
concrete or cement mortar
will start losing its
properties.FST is the time after
which mould can be removed.

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have an span length 16 ft c/c

1067


What is Curtailing of R/F

1988


any book or article on pumped concrete.

1735


All aptitude question of Bechtel

1423


Give me an example of a time when something you tried to accomplish and failed.

2497






What is the zero value in quantity surveying

2017


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1576


what are the Task work of different labour.?

2164


How to take labor charges for construction of 1cum of concrete?

688


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5133


How to calculate plastering for elevated water storage tank

825


In cement making,what is meaning of blend,fineness,density. 

2984


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

1630


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2747


explain what do you mean by the property development.

1632