ALLInterview.com :: Home Page
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   Errors
   Testimonials Refer this Site  Refer This Site to Your Friends  Site Map  Contact Us      
   
 
Categories >> Engineering >> Civil Engineering
 


 

 
Question what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
 Question Asked In Companies :: ABB, L&T, Saudi Oger, Construction, l, Isher, Spectra, Strati,     < I also faced this Question! >
 Question Submitted By :: shaunpaulstar
  Answer Posted By  
 
Answer
volume.

Is This Answer Correct ?    46 Yes 31 No


 
  viplav
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc. 675
What is the differential length of steel reinforcement? What is the over lap length of steel in different grades of concrete? 871
How to decide/consider the grade of bitumen for dbm. 402
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel. 402
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40. 1044
how to find hardness of water?why it should be determined? 373
What are the RISKS during the project construction? 394
what course did you consider thinking before you enrolled in college? 691
to construct 1450 rft length of 6 feet wall how much cement sand and blocks are required???? 405
what would be the design load of R.C.C Cooling tower per cell.? 365
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer 303
What is the cost difference between site mix and ready mix concrete per cubic meter 176
I want to calculate the footing 90º L bend as a techincaly 496
how much cement is required for 3200 sq ft of roof 311
How much cost will come for 900 sq ft cement plastering 203
E-Mail New Answers        Answer Selected Questions