ALLInterview.com :: Home Page
 Advertise your Business Here     
Browse  |   Placement Papers  |   Company  |   Code Snippets  |   Certifications  |   Visa Questions
Post Question  |   Post Answer  |   My Panel  |   Search  |   Articles  |   Topics  |   Errors
   Testimonials Refer this Site  Refer This Site to Your Friends  Site Map  Contact Us      
   
 
Categories >> Engineering >> Civil Engineering
 


   

 

Question what"s the formula to find the quantity (consumption) of
cement,sand,aggregate for 1m3(1:2:4)?
 Question Asked In Companies :: ABB, L&T, Saudi Oger, Construction, l, Isher, Spectra, Strati,     < I also faced this Question! >
 Question Submitted By :: shaunpaulstar
  Answer Posted By  
 
Answer
volume.

Is This Answer Correct ?    46 Yes 32 No


 
  viplav
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
how to calculate rate analysys of 1:6 plastering 10 sq m 1242
how to calculate the density for high density concrete ? or is it same as the density of RC? 644
strength vs shape factor 830
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft 511
what is relation between SPT N value and driving piles after conducting a soil test? 408
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure? 890
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches. 315
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands? 468
Describe the role of independent Quantity surveyor? 1049
what is the water-cement ratio of mix design while 30mpa in 7 days? 1370
what is the weight of 6000 psi concrete in lb/cft? 1221
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer. 1882
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam. 466
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview? 523
What is the name of this multiplication factors ? 526
E-Mail New Answers        Answer Selected Questions