What is the diffence between prescribed mix and design mix

Answer Posted / viplav

given mix is prescribed and design mix is to quality and
its requirement safe is used.

Is This Answer Correct ?    3 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the software used in civil engineering?

665


can stub column take the load as main column

1421


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

1888


for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

1413


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2346






Explain different types of rcc pipes.

711


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1648


How to decide/consider the grade of bitumen for dbm.

1768


How to calculate quantity of plum masonry in 1:3:7

2527


indian standard split spoon sampler

1558


what is right & short method of measurement of slab&beam

1647


What goals do you have in your career?

1699


Define What is the tallest man made structure in the world?

660


what is the maximum number of course that can be laid according to IS code and the max height.

1488


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

5569