how you calculate the qty. of cement ,sand,aggregate from
proportion 1:2:4 M15
Answer Posted / viplav
while using the proportion
Is This Answer Correct ? | 5 Yes | 12 No |
Post New Answer View All Answers
Define line type?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What are the important hardware systems used for cad?
what is the effect of duration of earth quake on framed structures ?
How to calculate brick work quantity?? Block work quantity??
why demand factor less then 1 ?
how to calculate the weight of concrete
how much cement and sand required for 1cum rr masonry
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
what is the difference between replacement of cement by groundnut shell ash
What is oneside mat. And explain
how to convert sand in Cft to Kgs