Difference between the setting time and hardenin time of
concrete
Answer Posted / sujit ( hari machines)
setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.
Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
How to come 1.54 from dry to wet concrete?
how to control PQI (Project Quality Index)
procedure for preliminary selection of size of column of 5 storey building
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
How do you maintain water pressure?
What is the crank length in the slab?
what pressure the NP2 class RCC pipe can sustain?
What are the causes of building collapse?
Describe the role of independent Quantity surveyor?
What is the primary difference between adsorption and absorption?
what is the service corridor?
what is mean by c32/40s concrete class
How many Sft of Level Plaster per Kg
detailed calculation of the amount of cement used?