Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Difference between the setting time and hardenin time of
concrete

Answer Posted / sujit ( hari machines)

setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.

Is This Answer Correct ?    5 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much quantity of cement,sand and water required for 1 sq feet flooring work .

2529


What is meant by engineering drawing?

1072


How you can turn off the display for dimension in CAD?

1093


How to cal. The weight of hollow pipe?

1229


why does the most of civil engg is not intersted to going for teaching field?

2080


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2131


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

2422


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

2520


Why are steel plates inserted inside bearings in elastomeric bearings?

1185


Why the finite element method is lower bound solution?

2988


What is difference between code and standard and specification?

2395


What is difference between engineering stress and true stress?

1198


what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

2335


What is the likely strength of a 1:2:4 concrete mix?

1098


How do we calculate the power of centrifugal pump?

1185