Answer Posted / sujit ( hari machines)

setting time is taken by concrete to its minimum strength
in 7 days. harden time is time taken by concrete to its
maximum strength.

Is This Answer Correct ?    5 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4502


How to come 1.54 from dry to wet concrete? 

1819


how to control PQI (Project Quality Index)

9844


procedure for preliminary selection of size of column of 5 storey building

2557


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3709






How do you maintain water pressure?

659


What is the crank length in the slab?

636


what pressure the NP2 class RCC pipe can sustain?

2214


What are the causes of building collapse?

664


Describe the role of independent Quantity surveyor?

2453


What is the primary difference between adsorption and absorption?

733


what is the service corridor?

1920


what is mean by c32/40s concrete class

1336


How many Sft of Level Plaster per Kg

1125


detailed calculation of the amount of cement used?

1634