what is MIS (related to planning tools)
Answer Posted / sjtbehera
MIS is managment information system. this is done month
wise. it tells everything about project
| Is This Answer Correct ? | 29 Yes | 0 No |
Post New Answer View All Answers
What is the origin of name railway sleepers?
Why are separation membranes used between concrete pavement slab and sub-base?
what is the difference b/w full length and cutting length?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
what are the five benefits of using standard terminology in the measurement process?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
IS code for grade of concrete for bamboo lintel????
What do you mean by tolerance factor of concrete ?
a butt weld is specified by
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
Which is the direction for positive angle?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
how to calculate testing date
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.