Iam Preparing For Ap Transco Assistant Engineer
(ELECTRICAL) Exam how To Prepare What Is The Refernce
Books.can You Give The Advises To Me.tahnk You. This Is
Radhika Iam Preparing For Ap Transco Assistant Engineer
(ELECTRICAL
Answer Posted / iamdon
Dear Radhika,
You can refer a book.It is a handy reference with compact
theory and ample number of objective questions with
answer.The beauty of this book is it is almost error free.
Title:An integrated course in electrical engineering.(3rd
edition)
Author:J.B.Gupta.
Publisher:Katson books.
Price:approx 350.
Enjoy learning.
Is This Answer Correct ? | 38 Yes | 13 No |
Post New Answer View All Answers
Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028
What is meant by vector group
PLZ EXPLAIN CORONA,SKIN,BIRD PALE,SPAN,SAG Effects of power cable.
In what condition the HT fuse breakes?
Differenciate between circuit wiring and sub main wiring with illustrations
How much pf maintan in dg set in 6o% load,when Dg runnig Neutaal Earthing removed what happen.
what are carbondioxide and dcp used in fire extinguishers
what is a synchronizing lamp ?
Following test should be conducted to find out relative polarity of transformenr terminals A no load test B back to back test C phasing out test D none of above
if two transformers are placed parallel & both have fault impedance of 50KA will it increase or decrease show example?
What do you mean by ratio correction factor of instrument transformer?
What test must you do before powering up a circuit that you have been working on?
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?