What power factor maintain you maintain at u r organisation
Answer Posted / sandeep lole
In industries, mostly the loads are inductive type. So the
PF is low near about 0.8 lagging. Due to that the load
current is maximum.We can improve the PF by using Capacitor
bank in industrial substation. So that we can improve Pf
upto 0.99. For that proper design of capacitor bank is
important.
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....
Why line VTG = √3 phase VTG in star? How?
Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing
If the earth is a good conductor of electricity, why don't people get shocked every time they walking on earth?
what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????
what is stper motor
What does the term “voltage regulation” means?
List examples of voltage source?
will 1050kva DG set withstand for back charge of 16MVA transformer
What is trip and closing coil in cb? Why need of them
excitation limit of an excitor
how to do the ductor test?
raleigh method
How many lightning arrestors to be installed on 50MX60MX10M building and is there any formular for that?
what is solkor relay and which condition it will act?