how you calculate the data (all parameter) after transient
response method i.e.pile intigrity test on pile.

Answer Posted / abhijit

1.by integration,
2.by static formulea

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the density of most of construction materials?

730


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1367


What is Heavy Concrete & Normal Concrete

2237


what is flashing?

722


Formula for calculating the volume of bulb in underreamed pile

4401






why does the most of civil engg is not intersted to going for teaching field?

1613


What are the common ways of demolition?

722


How do you compute volume of airflow?

689


How to calculate laplength for 3 floors

1349


how to calculate rate analysys of 1:6 plastering 10 sq m

2505


what"s the sort of beams?

1819


what is mean by reestimation?

1358


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1697


Slab quantity 

1606


how calculate the bearing from two coordinates?

1762