Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to set configuration values in laravel?

399


if you wish to use the rewrite command how must the vsam file be opened?

663


Should you use animation powerpoint?

112


How many types of operators are used in the Perl?

572


How can I tell which files in the database correspond to files in my project?

858






Explain what if a cartesian product pop up block appears when running a report. Does it give wrong values? How to solve this issue?

610


If the programmer wishes to execute an instruction at the specified time. Which command is used?

890


What is build verification testing, bvt?

603


Why do I have to disable link state routing?

483


What are the themes in a data warehouse?

573


Do you need microsoft visual c++?

600


How can we exit the spy mode in blue prism?

192


What is meant by Total Quality Control?

5


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1549


What does b mean in code?

412