sigal phase supply is 230 v ac
two phase supply is 415 v ac
why three phase supply is 415 v ac why not 690 v ac

Answer Posted / prmeghwanshi

Because you measure voltage between onlt two point like RYB
when you connect N to any other RYB then voltage is 240V
(App.) this is called single phase.
when you connect one point into RYB(R) and other is also RYB
(other than R) is 440V this two phash. when you use three
phase voltage is measure in only two point like R to B R to
Y so it is also 440V. you can't measure voltage betwween
three point.

Is This Answer Correct ?    15 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain Active power,reactive power,how its related to each other , & inductive ,capacitive.

1464


Where is the best place to mount  distribution panel in a house.

1638


What does the term supermesh means?

671


how to decide no of electrodes for 1600A LT Main incomer panel

1185


What is corkscrew rule?

684






can anybody send me syllabus of rrb section engg (electrical). and also send previous question pepar...

1574


What are the specifications for conducting earth leakage test as per IEC standard?

1523


can any one suggest me the tilt angle of my solar pannel ?? or tell me how can i know the fix tilt angle of my solar pannel?? my cordinates are 31.503629,72.993164.

1387


How to reduce -234126219.6403 MVAr generation and by what?

1238


From reading, Under voltage relay used also as phase sequence relay now, Why I use under voltage and phase sequence relay in the same circuit (ATS)?

1317


why can we use cosine wave instead of sine in ac supply as both have same rms vale and ripple factor

2074


What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.

3024


HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?

1627


oltc of a transformer, how it works? and what are the equipment consist of describe briefly?

1573


What facility we get after CT secondary earthing and how?

1728