Answer Posted / suresh ch
If u know levels take some value as datum, draw datum line and mark the level with respect to datum line and join the levels we will get profile of that road. we can draw profile by using graph or auto cad... suresh
Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
how to calculate freeboard in under ground water tank and technical details
What is the use of extruded feature in solidsworks?
What is reinforced concrete?
why is M30 grade Concrete use for Foothing & Column M50
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
What was asked in isro civil interview
Why are pull-out tests performed for soil nails?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Mention what are the composition of a landfill?
what do you know that m20,m25
What is the substitute of Mastic Asphalt?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???