Answer Posted / binu
5mm is the least count
| Is This Answer Correct ? | 79 Yes | 6 No |
Post New Answer View All Answers
what are the changes in concrete pour height as per IS 456, 2009?
How long does it take concrete to harden?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
What is alternate bid?
Explain what is change order request?
how can we construct building without foundation providing only grade beam at ground level
Write short note on construction programme for pile foundation.
what is the anchorage length of reinforcement.
how do we design mix ratio?
What is the difference between one-way slab and two-way slab?
Reinforcement details at hinged joint
What is the Roll of Water Bonding under VDF road?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What is the difference between built area and super built up area?