How to calculate labor requirement or requirement of labor
projction for a proposed multistoried building for which
quantities of different items of work has been already
calculated stage wise ?
Answer Posted / binu
Labor requirements can be availed from fidick or any estimation books also historic data can help in ascertaining the same
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
all technical question
Define What is the best type of wood glue?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is critical path method (c.p.m)?
what is right & short method of measurement of slab&beam
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
what is modular brick and it size
How to come 1.54 from dry to wet concrete?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
What are the different types of runners?
what would be the design load of R.C.C Cooling tower per cell.?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how can we calculate steel value, depending on load
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11