is there any information regarding MPSC2010

Answer Posted / bunty chandwani

MPSC 2010 is scheduled on 20th and 21st of Feburary. The
last date for form submission is on 13th jan 2010.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

satart to end steps by step process of building construction...? i want to planning theme accuretly

1452


What difference comes in constructing of house and a housing complex like society

1426


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1800


what is the ingredient value of 40mm and 20mm aggregates?

1557


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

1824






how to calculate the length diamond shaped striupps in column

2208


How do you prepare Material Recovery Statement for deduction from contractors bills?

1109


1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?

6113


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1102


Minimum and maximum size of the building components

1771


if the nitrates more than 45mg/l in water lead to disease then what is it called

2344


Why should you show Client/Engineer activities clearly on the project plan?

1958


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

968


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2042


pls tell me , what is the water content

1672