Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i need mat lab program to find out the transmission line losses,regulation and losses

1422


Explain the benefits of destructive testing.

586


Explain the significance of the angle of repose holds in the chemical industry?

650


explain platform as a service?

5


What is use of final keyword in java?

494






Can we run c program in turbo c++?

567


Is session method, asynchronous or synchronous?

138


What are the three pl sql block types?

560


What is hql in hibernate?

146


Are there interfaces in c++?

544


What is dynamic keyword in swift?

476


My question is whether bellow formula is correct to find bus size for 46kA for 0.5 second & what is RT in bellow formula. formula to calculate the size of busbar to withstand the thermal stresses due to currents with duration of 0.2 sec to 5 sec. Sp = RT( I x I x t) / K Where Sp – is the cross sectional area of bus bar in millimeters. I -    is the value of AC fault current. t -    is the operating time of disconnecting device in seconds. K –  is the factor depending on the material of the conductor, insulation and initial and final temperature. Value of ‘k’ for copper is 143.

1433


I'm having problem how to know if certain SD Doc has been paid already. i had already viewed BKPF/BSEG/BSAD/BSID/BSAK/BSIK. I'm a novice ABAPER and when the requesting dept want a report, they just show the layout without proper functional specs. Co'z they dont also know where/what field. Can somebody give a hint or overview which tables links or any flagging fields that triggers a certain DR#(Billing Docs) has already been paid? Hope you can forgive me on this matter. We dont have any training/seminars bout SAP modules. We only take ABAP using SAP script only. I learned ALV through my self-study. Thanks in advance.

1546


how mny tyoes of profiles can be configured

1733


Define decoding or deserialization?

477