Answer Posted / mohd.younus ali , je (pr )
M-15 :- (1:2.5:5) Nominal Mix
M-15 :- (1:2:4)
M-20 :- (1:1.5:3)
M-25 :- (1:1:2)
Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what are the ffactors you considered choosing the course?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
why we are using stub column..? is it possible to construct steel stub column..?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
what is called the inverd level of mabhole chamber?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is a tensile strength? What is the tensile strength of wood?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
How is the leaning tower of pisa supported?
Why joints are provided?
How do you convert wind speed into force?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
How to build the floor to ceiling bookcase?