WHY DO YOU WANT TO WORK HERE?

Answer Posted / dharmendra lakhtaria

Because both of us requirement...

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In jack arch floor, the rise is kept?

714


silt%= silt volume/ silt+sand volume is this right?

1516


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

779


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1331


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2541






What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1858


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2409


How do you measure concrete?

777


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1638


What is binding spacing of the rebars at lapping zones.

618


why we use aggregate,sand with cement in concrete?

8138


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1841


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2118


what's the formula for calculate pcc for matt(45mm aggregate)?

2163


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

5926