Answer Posted / dharmendra lakhtaria
Because both of us requirement...
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
In jack arch floor, the rise is kept?
silt%= silt volume/ silt+sand volume is this right?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
How do you measure concrete?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is binding spacing of the rebars at lapping zones.
why we use aggregate,sand with cement in concrete?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what's the formula for calculate pcc for matt(45mm aggregate)?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs