Answer Posted / manikandan.d
PLC can control only one system at a time where as DCS can
control multisystem at a time DCS has its own database while
PLC does not. it has to use SCADA or MMI. scan time for PLC
is less than 10ms where as scan time for DCS is less than 100ms.
Is This Answer Correct ? | 29 Yes | 12 No |
Post New Answer View All Answers
how to calibrate 0- 150 psi presure gauge by dead weght tester
How does work A temperature valve or fv control valve in process plz brief me
all types of liquid analyzer principle with drawing?
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
How do you identify between actual alarm and false alarm in a Temperature Transmitter in SCADA based Control System
kindly sent some demo question and answer
protection relay watchdog contact operation?
can u plz send me technical questions asked in SCHNEIDER ELECTRICAL technical paper?
why using negative supply for bentley nevada vibration system ?
What is the difference between mmwc and mmwg?
WHAT ARE THE INSTRUMENTAL DIAGRAMSOF VALVES?
What is zero elevation and zero suppression?
How digital input and digital output 's are working in dcs
What is the diffrence between ff tx and non ff tx
How to calibrate the flow transmitter