Answer Posted / ahmed
Daer
the amount of cement in m3 according to ACI code with
mixture ratio 1:2:4 is 300 kg
and the amount of sand is 0.42 m3
and the amount of cource aggregate(gravel) is 0.84
regards
civil engineer
Ahmed Sami
IRAQ
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What is bylayer?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
types of laps in column
How will be cutting in timber plate size 600*400 column size
How much material is required for constructing a 2 Lane 2Km rigid pavement road
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
How do You Maintain a structure after getting cube test of low strength.
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
Define What is a projection line?
What is the absolute pressure scale?
What is Grid floor and mention its advantages ?