Is 456 revised lastly in which year? & What are the revisions?
Answer Posted / sidharth
well its in year 2000. The basic change is, for all RCC
work the minimum grade of concrete becomes M-20 instead of
M-15
Is This Answer Correct ? | 35 Yes | 3 No |
Post New Answer View All Answers
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What is the worlds largest concrete dam?
how we calculate the grade of the Bituminous materials.?????
how to calculate testing date
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
What is the ideal size of the living room ranges from small to large size?
What are advancements in civil engineering?
What are your goals?
about higyway engineering
What is type failure of road surface? how to repair the failure of road surface?
What is Rankine Cycle?
what is the permanent solution applied for restoration of leaning tower of pisa?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.