Is 456 revised lastly in which year? & What are the revisions?

Answer Posted / sidharth

well its in year 2000. The basic change is, for all RCC
work the minimum grade of concrete becomes M-20 instead of
M-15

Is This Answer Correct ?    35 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

1877


What is the worlds largest concrete dam?

711


how we calculate the grade of the Bituminous materials.?????

1823


how to calculate testing date

1229


HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

1672






What is the ideal size of the living room ranges from small to large size?

655


What are advancements in civil engineering?

644


What are your goals?

2102


about higyway engineering

3548


What is type failure of road surface? how to repair the failure of road surface?

1977


What is Rankine Cycle?

661


what is the permanent solution applied for restoration of leaning tower of pisa?

3057


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

1849


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1215


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2186