FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN
WHERE RUN OFF WILL BE HIGHEST?
Answer Posted / ruchi
runoff will be highest where the permeability of the soil
is minimum( coef of pearm. 'C' will be maximum).
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is meant by scaffolding coefficient?
Permissible wastage of cement as per IS code ? In which IS code I get it?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
Why should pumping be not used in case of concreting works?
In cement concrete how to check a quality of material also proportion of material at site ?
if the nitrates more than 45mg/l in water lead to disease then what is it called
silt%= silt volume/ silt+sand volume is this right?
How to calculate steel for beam slab and column
What is hybrid foundation?
How can we convert weight batch to volume batch for m30 mix
Explain what is the release of lien?
Describe a time when you anticipated potential problems and developed Preventive measures
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?