what is plc?

Answer Posted / samanthjose

built mechine controls computer designed to read digital
and analog inputs from variouse sensors.

Is This Answer Correct ?    9 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many types of preheaters are in cement industry & what r they can any body explain?

1323


can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.

1467


What is intrinsic safety mean.

1476


I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.

3308


can u briefly explain aboutan aryton shunt multirange DC ammeter?

2307






There are many type of control cable like pair,core,tried, What are defination each one

1742


How to calculate P,I&D value in PID controller ?

1631


How to Calibrate Flammable gas detector in field

727


Galvanizing.

1476


How d.p. Transmitter can be applied to close tank?

614


Exothermic reaction./ endothermic reaction

1539


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

1697


centrifugal compressor interlock? Tell me the parameter at which compressor will trip

2692


how to calibrate corollaries (Mass flow meter)?

1653


How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?

1180