what is plc?
Answer Posted / samanthjose
built mechine controls computer designed to read digital
and analog inputs from variouse sensors.
Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
how many types of preheaters are in cement industry & what r they can any body explain?
can anyone guide me how to get any of the previous year GAIL question papers? are they available? 0n 2nd august i have to take the written test.
What is intrinsic safety mean.
I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.
can u briefly explain aboutan aryton shunt multirange DC ammeter?
There are many type of control cable like pair,core,tried, What are defination each one
How to calculate P,I&D value in PID controller ?
How to Calibrate Flammable gas detector in field
Galvanizing.
How d.p. Transmitter can be applied to close tank?
Exothermic reaction./ endothermic reaction
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
centrifugal compressor interlock? Tell me the parameter at which compressor will trip
how to calibrate corollaries (Mass flow meter)?
How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?