1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
| Is This Answer Correct ? | 477 Yes | 71 No |
Post New Answer View All Answers
Detection of a beam & a girder are––––
What is the l/d ratio of cantilever beam?
The foundations are placed below ground level, to increase?
In block work seawalls what is the purpose of slip joints?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
how to tie 10 legged stirrups
What is chemical composion test
RR masonry rate analysis
what is Bearing Capacity,How to determine it?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
how calculate the bearing from two coordinates?
Ratio for 4500 psi concrete
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
types of survey and levelling instrument ?