mix proportion of M20 AND what are different grades below it
Answer Posted / nagori salim
"Nominal Mix"
(these Grades can also be designed in RMC as "Design
Mix")
M25 1:1:2
M20 1:1.5:3
M15 1:2:4
M10 1:3:6
M7.5 1:4:8
M5 1:5:10
Grades above M25 are "Design Mix"
Is This Answer Correct ? | 35 Yes | 8 No |
Post New Answer View All Answers
how to tie 10 legged stirrups
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how to calculate the weight of concrete
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Can we use the flyash bricks in brick bat coba?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
what is the permanent solution applied for restoration of leaning tower of pisa?
What is rate of concrete surface rendering work per sqm
Which purpose we use deck anchor in bridges?
Formula of mid span bar
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is binding spacing of the rebars at lapping zones.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
cement and sand required for one block of size 0.23*0.15*0.46