Answer Posted / ashalatha y
Proportion: 1:1:2
Quantity of Cement= 1440*0.92*2/4
=662.4 Kgs
=13.248 Bags
=13.5 or 14 Bags can be taken
Is This Answer Correct ? | 39 Yes | 70 No |
Post New Answer View All Answers
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
How many square meter can a worker/labor demolish a structure per day?
How to find CN by using arcgis 9.3?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to calculate valuation for the old building?
1m square 20mm plastering how much of water need curing work
Is it possible to make a feature using an overdefined sketch?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
What is type failure of road surface? how to repair the failure of road surface?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What are the advantages and disadvantages of using plastic and timber fenders?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.