plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / vkg
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
| Is This Answer Correct ? | 29 Yes | 19 No |
Post New Answer View All Answers
What is alternate bid?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
List out some of the checking’s, done at the completion of construction?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
How many axes do cartesian coordinate system has?
how many cement used in single story residential building per sqft
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How do You Maintain a structure after getting cube test of low strength.
Detection of a beam & a girder are––––
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
Why you are leaving present job?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is the difference between natural draught cooling tower and induced draught cooling tower
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks