plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / vkg
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
Is This Answer Correct ? | 29 Yes | 19 No |
Post New Answer View All Answers
What is reinforced concrete?
What do you mean by the word 'shear'?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
How many bricks are there in 100cft?
how to calculate MR 9(derivation)
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
what will be price of 1:2:4pcc per kg?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
How we calculate the service time of buildings
how to clculate the %of concrete strenght achive after curing?load
what is the meaning of 40/20 src
sir please send me campus placement questions in civil engineering