Generally In transformer Tap Changer on HT side, but I have
seen in 66KV side in 220/66 KV, 100 MVA, Areva make
transformer. Why ?

Answer Posted / kesaavan

Both sides are ht (py and sy).thats why they are fix
tapchanger in sy side.

Is This Answer Correct ?    1 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the advantages of speed control using thyristor?

656


what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end

1775


What are the characteristics of negative feedback?

615


Pleae send me last 5 years of Question book about RRB chennai.

1820


Explain what is rated speed?

677






What are test signals and their significance?

642


132/66kv sub-station procation ?

1722


best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?

1254


derive DC RMS value for half wave rectifier?

2720


How to calculate multiplying factor of dc energy meter

1213


why and where we use early make & late break contacts in protection?

7644


what is stper motor

1992


How to design the no. of ceiling fans required in 5mtr X 10 mtr X 3 Mtr hight room?

1691


how can i find ct ratio of meter by seeing name plate of meter and how it should be used in MF calculation if it shows only-/1???

1257


What is Icu and Ics and what is difference b/w them. please tell me how to calculate a size of a copper bar for a system or a breaker... reply on... king.arish@gmail.com would be waiting for a logical answer.

1942