plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / siva rami reddy
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
| Is This Answer Correct ? | 90 Yes | 18 No |
Post New Answer View All Answers
why we create short columns under grade slab?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
How to get MEP technical,instaaltion & testing data for interview?
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
How to calculate steel for beam slab and column
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What happens to Load at yielding ?
Formula of mid span bar
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is the difference between yeild strength and compressive strength of steel???
How many axes do cartesian coordinate system has?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..