As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / ramir v. agustin
Pinpoint areas of non conformity and find solutions to meet
the standard specifications.It is the resposibility that Of
QC personells to conduct tests and inspections during the
process of construction to ensure conformity.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
types of laps in column
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
explain the advantages of total stasion
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
Describe the sections included in a typical bill of quantities
Which Types Of Bricks ?
define the strength
Why are pull-out tests performed for soil nails?
What is Grid floor and mention its advantages ?
What is zoning permit?
Explain what is alternate bid?