IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / santhosh kumar
dear
britto/ram/saravanan
pls to sent your mail id to santhoshselvamani@gmail.com
Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
What is absolute coordinates?
what are the duties of Site Engineer in work site?
What are your goals?
How many square meter can a worker/labor demolish a structure per day?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
Design a rectangular channel.
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
How much material is required for constructing a 2 Lane 2Km rigid pavement road
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
how to calculate the strength of rebound hammer test reading in building construction ?
Define What are the uses of Groynes?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
The largest size of paper used in plotter to print the drawing made by Autocad .
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
How to calculate canal slope curvature qty!