in a transmission line the aluminium cor is sarrounded and
in between there is a another type of matrial what is that?

Answer Posted / reddy

i dint ask the name of conductor i know it is a acsr
conductor but in the middle a single wire is there that
looks to be very hard i required that name

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?

1682


we have 2.2kw,Y,3000rpm motor but 6leads found in TB what happen if we connect in delta?

1260


PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com

1621


66kv under ground cable how to layaing in ground any special case two ckt r runing

1540


please give me all the Alarm .Trip ,Safety Relays & Conditions of UPS Systems mail me on ashokbabunhce@gmail.com

1373






what are the 4 rules to start the motor?

1682


What is difference between isolator and circuit breaker?

623


Difference between shunt, PMG and AREP excitation. Which is the most reliable between PMG and AREP.

9021


What is the different between digital phase converter and ordinary phase converter?

663


sir pls send the je exam - 2008 and other model question papers..

1664


State any two nuclear power stations in India, with their generating capacity.

1396


i am going to attaned the engineer (disign)iterview at HAL please give me duid line

1779


WHAT IS counter flux IN CT?

1530


can i connect the two phases of scott connected transformer,if not why?

1513


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1569