Answer Posted /

Is This Answer Correct ?    Yes No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How To see all the tables from a database of mysql server.

573


Is blue prism associate in nursing rpa tool?

120


Are subqueries faster than joins?

563


What is cache in asp net?

522


What are main features of ms excel?

319






Differentiate between run time error and syntax error.

561


What are the different reports under plant maintenance in information system?

495


What is dirty page?

558


Why are so many drupal versions available - 4.x, 5.x ...? Which one should I use?

81


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1937


Is there any sort function in java?

570


Can we create an object if a class doesn't have any constructor ( not even the default provided by constructor ) ?

544


Explain pivot and data models?

134


Is array an object in java?

541


What is V8 JavaScript Engine?

253