DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / omprakash
B. CHECK 250 HRS OR 6 MONTHS
C. CHECK 1000 HRS OR 1 YEAR
D. CHECK 1500 HRS OR 2YEARS
Is This Answer Correct ? | 90 Yes | 26 No |
Post New Answer View All Answers
1600kva capacity Transformers how the bucholz relay,Oil temperature,winding,surge relay relays setting are to be done
what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?
Why the unit sizes of hydro generating machines are not standardized as in case of thermal powerplants?
i am going to attaned the engineer (disign)iterview at HAL please give me duid line
How to measure size of cable on a given load
1.What is captive power plant? 2.What is national grid?Give brief idea.
Parts of machine and their discription in details with suitable photo
How to Prepare preventive maintenance shedule of machine tool.
why the NGR (neutral grounding resistor) always OFF during DG off?
which metal is use in shunt
HOW DO I CALCULATE THE SETTINGS FOR THE DIFFERENTIAL PROTECTION OF A 12kV/6.6kV, 6MVA,DYN11 XMER WITH PRIMARY SIDE CTR 400/1 AND SEC SIDE CTR 600/1?
Give details of your interested designation, the post you are interested to serve the company better and explain why you think you can serve the company better in such position if employed?
how to get bearing & winding temperature of an induction motor?
I have a relay contact rated at 220v dc which is supplied with a 24vdc from the panel,for it to trip the dampers(24vdc).What if the application of the relay changes so that it should work at its rated 220vdc then will it work at 24vdc supply given or any other consideration needs to be taken .....
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?