Answer Posted / venkat narayana
Every body knows that ELCB ---> Earth Leakage Circuit
Breaker it itself indicate that whenever Current leaks and
go to Earth then it trip the circuit that called earth Leakage.
But where as RRCB Residual Cuurent .i.e sum of all Vector
sum is not equal to ZERO that is called Residual. Whcih
flows through the neutral, THis can set according to our
Load condition, that is it trip under Unbalnced currents.
Ir+Iy+Ib = In = 0 Noraml Condition
Ir+Iy+Ib NOt equal to ZERO, under unbalnced condition.
Further details can contact : venu24502yahoo.com
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
how to find ratio of CT & PT in 66/11kv 12 mva supply system ? explain with calculation.
when we have to use UPF wattmeter and LPF wattmeter? what is the difference between UPF and LPF wattmeter in terms of construction?
How many types of circuit loads are there in a common electrical circuit?
how to select energy meter? have any calculation?
Define step response?
What is minimum phase system?
The power supplied to a 33microF capacitor from a 120V, 60Hz source will be
what is the difference between ac motor and dc generator
At what factor resistance r of a conductor depends?
Which thing is maximum in RLC circuit at resonance a)power consumption b)inductive current c)capacitive voltage
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
what is V.L.F. testing of power cable? do you know the voltage ratings, like for what rating and size of cable what rating of V.L.F. testing is used?
When calculating the speed of a rotor required for a particular frequency of synchronous generator we use the equation 60f/p Is this p is the number of pole pairs of rotor & do we consider the number of pole pairs in the stator is 1?
1)Explain why the cradle guard is used on railway crossing in overhead line construction?
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.