Answer Posted /

Is This Answer Correct ?    Yes No

Post New Answer View All Answers









Please Help Members By Posting Answers For Below Questions

Whether C Form can be issued for the transactions that made 5-6 years back? What are the procedures?

658


MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)

614


We need to write the function to check the password entered is correct or not based on the following conditions.. a) It must have atleast one lower case character and one digit. b)It must not have any Upper case characters and any special characters c) length should be b/w 5-12. d) It should not have any same immediate patterns like abcanan1 : not acceptable coz of an an pattern abc11se: not acceptable, coz of pattern 11 123sd123 : acceptable, as not immediate pattern adfasdsdf : not acceptable, as no digits Aasdfasd12: not acceptable, as have uppercase character

2878


What is the toughest moment you faced in your testing carrier in which everyone praised you?

709


use of PIR in ehv breaker

538


Write a Program to add 2 numbers without using operators (+,-) and without using third variable. Note: Use VBScript only Hint: You can use other operators like '/' & '*'(Division & Multiplication)

2146


What is mean by incident logging system ?

553


what is the relational database of tables and forms

1019


do any one help me to get "C" license,, i have doubts ,,, if mediators ter pls call me,, my no is 8056640042

63


pls tell me , what is the water content

342


Why we use 4 - 20 ma?

442


what happens when a cdma user becomes as a roamer?

474


hello friends.....dis is gargi from kolkata....when will the result publish???do u have any idea?

500


Hi guys, Our company has started to automate testing and started using the tool QTP.Iam new to QTP and I have the following questions to ask. Would appreciate if anyone could give me a hand on this and explain things in a detailed way. [1] Bugs outside checkpoints: I know that I can easily make the QTP do what I want inside the application. Also, I know that I can insert some checkpoints and that the qtp will notice if those conditions are not met. However, there are bugs and problems that might not be connected to a checkpoint (system crash, database error, losing session/logout etc.); how can I make sure that the QTP will notice such problems as well and flag a test as failed. [2] How to tell the QTP that when a particular statement is "false",it should flag it as, test failed and show in in the test report. In short how to tell the qtp that a test is false from the script so that it shows it in the report For Eg:- if(true) test passed // how to instruct qtp else test failed // how to instruct qtp [3] Test script portability: we are having several environments; If I record a test on User Interface, obviously, the qtp will save the URL; however, how can I make the qtp run the tests so that the url is provided dynamically. Is there a possibility to parameterize the web server.Is this the way to do it.I dont know? [4] Test management: How do I manage the tests? I guess we will be doing it in Quality Center, yet, it’s not perfectly clear to me how we will be doing that. [5] Running scheduled test sets: How do I group tests to a certain test set? How can I make this test set run at a predefined time? [6] Test maintenance: What do we need to do beforehand in order to enable for easy test maintenance, meaning small adjustments in tests? [7] Reports: What kind of reports on test results are available (either QTP or Quality Center)? Thanks in advance and hoping for an answer. Jen

477


Direction of flow of active power and reactive power with logic?

210