curing duration
Answer Posted / deepak kumar
According to hydration process and strength gaining process
of cement 28 days curing is required but according IS code
of opc cement 7 days curing is required and in ppc 14 days
of curing is required. But above of all continuous curing
is very important for any construction instead of how many
days we cure it.
Is This Answer Correct ? | 24 Yes | 5 No |
Post New Answer View All Answers
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
how to compute slab reinforcements on step by step procedures??
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
how we can find sieve #4 is 4.75mm?
what is directivity effect?
will fix foundation bolts at site with out template is there any procedure?
What was asked in isro civil interview
RR masonry rate analysis
how to calculate mivan shuttering matrial
what is the meaning of 40/20 src
Define What is the difference between routing maintenance and major maintenance in school facilities?
Technical Question of Civil Engineering
what pressure the NP2 class RCC pipe can sustain?
Why should you show Client/Engineer activities clearly on the project plan?
Give me an example of a time when something you tried to accomplish and failed.