Answer Posted / maharajan
KW means machanical power(mechanical load) o/p of the system
but KVA means electrical power output(electrical load)
Is This Answer Correct ? | 15 Yes | 71 No |
Post New Answer View All Answers
What is Instantaneous Earth fault relay,how will work
Write down the design procedure of commutaj.
i have interview in Pepsi company what type of question will ask please send the question and answeer
We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?
Do u know any one? how to find out in motor rated amps? formula?
HOW TO CALCULATE S/C,O/C,E/F OF ACB.
Define resonant frequency?
how much winding resistance of 0.75kw to 12.5kw 3ph sqwiralcage induction motor?
hi frnds can any one help me ? plz send me placement paper of IOCL of Electrical streem .... plz send ....its urgent....
why co incidence factor considered in transformer sizing?
Can anyone explain me about the RLC based Impulse high voltage generator and how to and operation of Series resonant High voltage reactor...?
Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting