mix proportion of M20 AND what are different grades below it

Answer Posted / s.stalin babu

M5-1:5:10, M10-1:4:8, M151:3:6, M20-1:2:4, M25-1:1.58:3,
M30-1:1:2(M30-Design Mix)

Is This Answer Correct ?    10 Yes 51 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5609


What is meant by autocad?

661


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2129


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1652


What is the outturn of Ceiling plastering

2856






Why Is Propping Required For Long Structures Once The Form Work Is Removed?

696


in plate load test what is the thickness of plate 20mm 5mm 50mm none

1714


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

1630


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

1429


What are the applications of cad?

671


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

1987


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


How to find the cuplock pipe qty in staging for Minor bridge?

708


plumbing CPVC fitting FTE Brass full form

2132


what are the duties of Site Engineer in work site?

1166