Answer Posted / engineer younus
M-15 (1:2:4)
M-20 (1:1.5:3)
M-25 (1:1:2)
Is This Answer Correct ? | 40 Yes | 2 No |
Post New Answer View All Answers
What is Heavy Concrete & Normal Concrete
Critical Path Method is...
How to do rate analysis for concrete work including shuttering work?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
any book or article on pumped concrete.
how to calculate the length diamond shaped striupps in column
What is type failure of road surface? how to repair the failure of road surface?
How to fix toll charge for a particular vehicle at toll booths in a highway?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Define What is the tallest man made structure in the world?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
What is the quantity of cement in mix m20 concrete?