Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

basic mechanical oriented questions

Answer Posted / paramasivan

plasticity

Is This Answer Correct ?    71 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

whats the Formula to calculate temperature of steam at given pressure

1767


which type of material is F125?

3346


For conduction of heat, the instantaneous rate of heat flow is product of three factors. What are these ?

957


What are the causes of damage to propellers?

1954


what is your ideal job?

2271


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1815


If you have a valve with an applied pressure, how do you determine the stress to the closed and open valve?

1899


what is punching force required for embossing of depth 3.5mm and diameter 58mm

2099


Explain the difference between projectile motion and trajectory?

1089


Why do you need a keyway in the construction of a wall?

1108


previous question papers for group 2

1897


What is the difference between Over Molding and insert molding ?

5324


what is cswip?

8947


Explain the hooke`s coupling.

1146


What is the furnace Oil viscacity

2154