25. Are you willing to work overtime?

Answer Posted / sjtbehera

Incase of project demand, i am ready for it.

Is This Answer Correct ?    14 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1737


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2772


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2209


What is a projection line?

708


What black man invented the clothes dryer?

681






Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted

1298


how to calculate the density for high density concrete ? or is it same as the density of RC?

1878


What are some structures that may be subjected to fatigue?

659


what is parametre for M25 after 7 days strength

1517


Does brick grows bigger every year?

666


2. What are the advantages of your present job, things you like about it?

2711


Why the finite element method is lower bound solution?

2306


How do you calculate reinforcement weight of steel?

666


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2308


what is the meaning of 40/20 src

5760