Answer Posted / sjtbehera
Incase of project demand, i am ready for it.
Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is a projection line?
What black man invented the clothes dryer?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
how to calculate the density for high density concrete ? or is it same as the density of RC?
What are some structures that may be subjected to fatigue?
what is parametre for M25 after 7 days strength
Does brick grows bigger every year?
2. What are the advantages of your present job, things you like about it?
Why the finite element method is lower bound solution?
How do you calculate reinforcement weight of steel?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is the meaning of 40/20 src