Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What should be the stanchan Height for installation of
Smoke detector & toxic gas detector in field,according to
qatar standard

Answer Posted / &#2997;&#3007;&#29

Height Factor should not be considered for Installing detectors both Smoke Detectors and Toxic Gas Detectors.

And there is no standards for countries such as qatar.america.

The concept is where the emission exists of gas leak or smoke,

while installation we have to be aware of Future preventive Maintenace. The Installation should be such it has to sense the existience of gas and it should be suitable place for calibration,preventive maintenance,and for corrective maintenance.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the minimum power (P=VI)to produce a spark?

1999


What is the formula of vabration sesore. i mean how to covert mils to volt plz share if any body knows   very argent : my mai is merajalam143545@yahoo.com

2519


The Design Calculation of Level Transmitter For Different Structure open & Closed Vessel, Eg. Diff. Level Tx., Capacitance For Continous Operation

2865


How digital input and digital output 's are working in dcs

2558


What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.

3028


How to calibration a control valve?

1178


POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?

2301


In a gas over oil actuator, after the opening/closing of valve, how the gas is vented out? How does the hydraulic/gas circuit function?

1829


why we use 3 wire rtd direct wiring for temperature measurement instead of temperature transmitter like bearing temperature

1833


What is feed factor and its Importance in cement industry? How we can solve feed factor?.

3617


Please any one can provide latest aptitude test,technical test and interview questions for tata consulting engineering (TCE) i need it asap thanks in advance

2039


Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..

4263


When doing a liquid seal on a differential flow transmitter , most of the time the sealing liquid will be heavier then the process fluid. For wich application will the sealing liquid be lighter than the process fluid if transmitter is mounted below the process line.

1828


what is The specifications for oriface instalation

2146


Specify eight technical requirements that you would consider important, when deciding upon a particular control valve?

1898