what is periode of deshuttering for different area of slab

Answer Posted / santhosh kumar

basically deshuttering of slab is in depend up on the mix
propotion of the concrete.and achived strength more than
75%.
like m15 is needed for deshuttering period is 21 days
we are using m20,for slabs need 14 days is enough.
in beams we are using m20 and above 10 ~14 days are
applicable in practcial.

for using post tension in the slab we are using m35
concrete in slabs it is deshutttered 7 ~ 8 days.(when the
portion is after stressed)
to calculate the concrete strength in lab take 3 cube of
concrete and tested in lab 3 cube average strength is
needed 75%.

Is This Answer Correct ?    59 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Form where IS456 is adopted in 1978?

1497


Exterior Joints,define

1533


What is pre-stressed concrete?

659


What is the density of DLC & PQC and how it is differ from normal concrete?

3012


Explain why concrete barriers have curved surface profiles?

821






types of laps in column

1914


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1477


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1613


What is reinforced concrete?

689


what is the productivity in aluminium shuttering per day

1577


explain the advantages of total stasion

1683


Is there the dry coefficient of cement is constant?

1832


insted of bentonite we can use any alternate material in piling ?

1704


all technical question

1684


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

1817