why are you interested in joining in core company instead
of joing in software company
Answer Posted / x man
The Aim behind choosing the course and sucessful completion
is to work in the Core disipline.
As my course of study had been theoritical i really need to
knowthe system in pratical and want my profession to be the
same.
HERE YOU MENTION YOUR INTEREST,AIM,ATTITUDE & PASSION FOR
YOUR CORE SUBJECT
Is This Answer Correct ? | 29 Yes | 2 No |
Post New Answer View All Answers
What is the difference between single point and double point bonding. please kindly detail about bonding of cables.
Why hydropower is called renewable source of energy?
at what base you will tell the direction of rotation of dc motors and generators?
what are inductive and capacitive voltage transformers.what are their applications
how we arrange the hv side with delta connection in case 33/11kv of transformer.
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
WHAT IS IM (INDEX OF MOUNTING )IN MOTORS
what is booster? and how it is connected in a circuit?
According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor
What is the function of interposing current transformer?
why they were using TRIAC instead relay in some controllers and what is the advantages.
what is difference between 9kv 5ka surge arrester and 9kv 10ka surge arrester.
what is the VA(Volt-amphere)? define with calculation?
what is x'mer ,isolation x'mer & yltra-isolation x'mer?????
How impulse levels are calculated that for 11kV impulse is 75kvp, for 24kV impulse is 125kvp ?