what are IS code for
M20, 25, etc
Post New Answer View All Answers
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
What is change order request?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Explain what is change order request?
for pretensioning which will yield first and same for post tensioning?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Difference between pre-tensioning and post-tensioning.
How many types bend used in civil reinforcing
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Explain moment of inertia and its importance.
how to create our resume?
give me the rate analysis for Bituminous Macadam and SDBC