Answer Posted / mukul chand
The scaffolding is a temporary structure (usually of timber) having platform raised for the workers as the construction increases in hight.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
how to calculate steel for slab or footings?
What is the general specifications of a bituminous pavement road?
The largest size of paper used in plotter to print the drawing made by Autocad .
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
60-70 grade of Bitumen is VG-30 ?
"Gates of the dams are generally designed of curved shape". Why?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is specific gravity???
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Why we provide hair pin for shed
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What are the advantages of building a dam on the river nile?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
can any one explain bar bending schedule of bems and columns and slabs ??