Answer Posted / jeganathan
IT IS AN EMPRICAL NUMBER ARRIVED BY DIVIDING SUM OF THE
CUMULATIVE PERCENTAGE RETAINED BY 100.
F.M OF SAND VARIES FROM 2.2 TO 3.2
Is This Answer Correct ? | 30 Yes | 12 No |
Post New Answer View All Answers
Define What is the origin of name Railway Sleepers?
what is directivity effect?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how much shouid be the rate for ready mix concrete per cubic meter
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
what is pqc
how can we calculate steel value, depending on load
Process of pcc in wateredug
Will water damage concrete?
What is difference between combin footing & rapt footing
Gidc technical que paper