Answer Posted / suhas
N1/N2=V1/V2=I1/I2
| Is This Answer Correct ? | 5 Yes | 23 No |
Post New Answer View All Answers
what exactly commisioning work does in electrical site work... LT side?..
how do i commission a distribution transformer knowing all its ratings and transformation ratios?d
explain Density
Purpose of providing neutral isolation panel for parallel operation of diesel generator
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
Either It Possible a dc Motor to Run On Ac Drive [ Ex : ACS 800 , Yaskawa F7 ] If it is Possible How Pls Inform Me dinesh_elect_eng@yahoo.com
suri transmission
What is the classification of hydro projects based on installed capacity?
What is the practical way to calculate the cable size for known ampere load?
how to store the thunder power?
Why air circuit breaker off due to power failure?
why sometime we get electrical shock while touching the ballon of dish tv connection ? which we should not get.
can any one provide me a connection wiring diagram for a DG set control panel along with BOM?
How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?
details of oil cell size of Breakdown voltage test of tranformer oil details as per Standardswith mushroom electrodes?