what can i do, if i want to carrier in design as i am
electrical engg?
Answer Posted / jayashree
Dear Raskar Sir,
I am too an Electrical Engineer having 5 years experience in
control panel division as Costing cum Design Engineer. My
job profile is preparing quotations, designing G.A.D, S.L.D
and power wiring diagrams. I want to learn to design control
wiring diagram. Is there any reference available for doing
control wiring dia.?
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain (in simple ) - root mean square. whats its role in electrical fundamandal.where its used
What is the bundle conductor?
What is earth system using on the floater TN-S or TT. Iam not sure and what ICCP
I want to make street light with solar system ... What may I do for procedure and how much of estimation for each material ... If any one knows guide me and inform this id : aravindd7@gmail.com
Please define ampere?
why induction motors are rated at 0.8 power factor.
what is the difference between earth leakage and earth fault?
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
What if high voltage side circuit breaker of a ehv transformer instead of lvcb? Kindly elaborate.
what will happen if multimeter(selector switch at DC voltage) and terminal at current is connected to DC supply?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
one split ac how can told of this ac which Tr tell me us
how invertor convert the dc into ac give brif detail
HELLO SIR, IAM PREPARING HPCL EXAMS. SO PLS SEND MATERIAL OF HPCL ELECTRICAL ENG..TO VIJAY_8888@YMAIL.COM
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?